Reconciling building violations in Egypt: deadline and cost

Law 187 of 2023 lets owners legalise most violations for a price per square metre set for each area. Here is the deadline, the bill and what a buyer should ask for.

By the Darna team7 min read
In this guide

Applications to reconcile building violations under Law 187 of 2023 are open until 5 May 2027, after Prime Minister's Decree 3166 of 2026 reopened them for six months from 5 November 2026. The bill is the violating area times a price per square metre set for each area, between EGP 50 and EGP 2,500, plus an examination fee of up to EGP 5,000. A violating building that never applied can't get utilities legally or be registered at the Real Estate Publicity Department (الشهر العقاري).

In short

  • Deadline: 5 May 2027. The window has been extended six months at a time since applications opened on 7 May 2024.
  • Price: EGP 50 to EGP 2,500 per m² of violating area, set for each area, then a share of it by type of violation.
  • Paying: up to 25% of the expected price with the application, the rest within 60 days of approval (up to 25% off), or in instalments over up to five years.
  • Never reconcilable: work that endangers the structure, building on antiquities or Nile-protection land, and garages turned to other uses.
  • An approval counts as a building licence. Without an application, a violating building can't be registered.

When is the deadline to apply?

The current deadline is 5 May 2027. Law 187 of 2023 replaced Law 17 of 2019 on 18 December 2023, and applications opened on 7 May 2024 under its executive regulations (Prime Minister's Decree 1121 of 2024).

Article 6 of the law lets the Prime Minister extend the window for periods that add up to no more than three years. The government is preparing amendments (garages in some cases, buildings near antiquities, a 50% discount for Takaful and Karama card holders), but as of early November 2026 the government had not yet sent them to parliament. Apply now rather than count on more time.

The law covers violations that existed before it took effect. For built-up areas outside the urban boundary, it names the aerial survey of 15 October 2023 as the reference.

What can be reconciled, and what can't?

Article 3 rules out three kinds of work, whatever you pay:

  • Work that harms the building's structural safety.
  • Building on land covered by the antiquities law (Law 117 of 1983) or the Nile protection law (Law 48 of 1982).
  • Turning a garage (جراج) into anything else.

Article 2 allows violations that don't harm the structure, including:

  • Building without a licence or beyond it, such as extra floors.
  • Change of use where there's no approved detailed plan, or where the plan allows the new use.
  • Building over approved building lines (خطوط التنظيم) drawn after the building went up.
  • Building on state land, once the possession has been regularised.
  • Building outside the urban boundary in listed cases, such as built-up blocks with utilities visible on the 2023 aerial survey.

For some cases that fail the conditions but can't be removed, the Cabinet can accept reconciliation at three times the normal price (Article 4).

How much does reconciliation cost?

You pay an examination fee and a seriousness payment with the application, then the reconciliation price.

ItemAmountWhen
Examination fee (رسم الفحص)EGP 125 (up to 250 m² in a village) to EGP 5,000 (over 4,000 m² in cities)With the application
Seriousness payment (مقابل جدية التصالح)25% of the expected price, capped: EGP 5,000 (village) or EGP 20,000 (city) for drawings and fences, EGP 30,000 or EGP 120,000 for change of use, EGP 250,000 for building without a licence in governorate capitals and new citiesWith the application, refunded if refused
Reconciliation priceViolating m² × the area's price × the share for the violationWithin 60 days of approval, or in instalments

The governor sets the price per square metre for each area by its urban level and services, between EGP 50 and EGP 2,500 (Article 8). In new cities, the Minister of Housing sets it as chairman of the New Urban Communities Authority (NUCA), as in Decision 884 of 2026 for new areas of 15 May City. The regulations then apply a share: 100% for building without a licence beyond the planning rules, 50% when the building meets them, 15% for breaches of the approved drawings. There's no national price list, so ask the technical centre for your area's price.

As an illustration: at EGP 1,000 per m², a 120 m² floor built without a licence beyond the planning rules costs EGP 120,000.

The Prime Minister can grant up to 25% off for paying at once. Or you pay in instalments over up to five years, with interest of up to 7% when they run beyond three years (Article 8). Missing two instalments cancels the approval (Article 12).

How do you apply?

  1. Get the structural-safety report: from a consulting office registered with the Engineers Syndicate, or from a registered engineer if the building is up to 200 m² and three floors (Article 7).
  2. Gather the papers: national ID, proof of your stake in the works and of when they were done, two sets of architectural drawings signed by an engineer, and the building licence if there is one.
  3. Apply at the technical centre (المركز التكنولوجي) of your district, or at the city authority (جهاز المدينة) in a new city, and pay the fee and the seriousness payment.
  4. Keep the certificate you get: it suspends court cases and demolition orders about the violation until a decision (Article 6).
  5. Complete the file within six months, or the request lapses. The committee then has three months to decide (Article 7).
  6. Paint the unfinished facades. Approval depends on it, except in villages (Article 9).

You can appeal a refusal or the price within 30 days (Article 14). Ministry of Local Development figures cited in October 2026 put applications at about 2.007 million, of which 1.751 million were finished (87%).

What does an approval change?

The reconciliation decision counts as a building licence with all its effects (Article 9). It ends court cases about the violation, and the administration must tell the utility companies within 15 days so the building can get legal meters (Article 10). It covers only the works inspected: anything added later is a new violation.

What does it mean if you're buying?

Before you buy in an older building, or a flat on an added floor, ask for the building licence (رخصة البناء) or the reconciliation decision (قرار التصالح). A certificate of application only shows the file is pending.

Article 10 is the reason. A violating building with no application, or with a refused one, can't be connected to utilities, pays for any it has at cost without subsidy, and can't be registered. A coded meter (العداد الكودي) on the flat usually means the building isn't licensed or reconciled yet.

If the file is still open, write into the contract who pays any instalments still due. Registration is covered in registering a property in Egypt, and the steps of a purchase in buying a home in Egypt.

Frequently asked questions

When is the last date to apply for building violation reconciliation in Egypt?

5 May 2027, under Prime Minister's Decree 3166 of 2026, which reopened applications for six months from 5 November 2026.

How much is the reconciliation price per square metre?

Between EGP 50 and EGP 2,500, set for each area according to its urban level and services. All of it applies to building without a licence beyond the planning rules, half when the building meets them.

Can a garage turned into a shop or a flat be reconciled?

No. Article 3 of Law 187 of 2023 forbids it. The amendments being prepared would allow it in some cases, but they hadn't been passed as of November 2026.

Can I pay the reconciliation in instalments?

Yes, over up to five years after approval, with interest of up to 7% if the instalments run beyond three years. Missing two instalments cancels the approval.

Can I register a flat in a building that hasn't been reconciled?

Not if the violations were never submitted or the application was refused: Article 10 bars registering such a building. Ask the seller for the building licence or the reconciliation decision before you sign.